Public App
Traffic system deteriorated in Dewas: Flyover on AB road is jammed, corporator inspected

Traffic system deteriorated in Dewas: Flyover on AB road is jammed, corporator inspected

The traffic system is being badly affected due to the flyover being constructed from Ramnagar intersection to Bavadia on B Road. In such a situation, the drivers passing through here are facing a lot of problems. Especially in the morning and evening in the morning and evening, a jam situation is being created in the boundary of the flyover under construction. In view of the people of the people, on Friday evening, SP Dr. Shivdayal Singh, Corporate Commissioner Vishal Singh, Traffic DSP and other officials, other officials and other officials walk on AB Road. Locked the status of the under -construction flyover and instructed the officials of the project under construction to organize the narrow routes from there. Other officials, including SP, also traveled on the service lane on AB Road and instructed to facilitate the traffic system. Due to which the traffic is being held. We had done a visit planning with the officials of the Municipal Corporation and PWD. In which wherever we feel that small construction work needs to be cured, people have directed the authorities for the people in the coming days. Copyright © 2022-23 DB corp ltd., All rights Reservedthis website follows the DNPA Code of Ethics.

Views:

July 22nd 2022, 2:51 pm
Amitesh Kumar
Better trained police required for better policing - IG: Passing parade ceremony of trainee soldiers of 3 districts held in Dehri, trainee soldiers held in Dehri

Better trained police required for better policing - IG: Passing parade ceremony of trainee soldiers of 3 districts held in Dehri, trainee soldiers held in Dehri